4465 Rte. 127, Chamcook NB E5B 2Z1 1-506-754-5956 This email address is being protected from spambots. You need JavaScript enabled to view it. Mon-Fri: 8:00am - 5:00pm

On Solid Ground

When you’ve been in the field as long as we have, you learn a thing or two — and we’re happy to pass that along. On Solid Ground is where we share the real stories behind the work: client experiences, project insights, and practical advice from the ground up. Whether we’re digging foundations, moving rock, or solving septic issues, every job comes with a lesson — and maybe a good story too. If you’re planning a project or just want to see how we do things around here, you’re in the right place.
Font size: + –
2 minutes reading time (313 words)

Helping Protect Those Who Protect Us

Old Legion site - St. Andrews, NB Canada

After the St. Andrews Fire Station moved to its new location on Reed Avenue, the original building found new life as the local Legion — a place filled with history, stories, and community.

But over time, the old structure began to show its age. The exterior brick wall started to deteriorate, with loose bricks becoming a serious safety concern for anyone using the building. That's when the Legion reached out to me and my team at Peter K. Gowan Construction Ltd.

We were called in to safely remove the failing brick siding — eliminating the hazard and making sure the building remained safe for community members and visitors alike.

A few years later, when the building had truly reached the end of its useful life, we were asked to return and take care of the full demolition. It was an honour to help bring the structure's story to a close — with the same care and respect we brought to every step along the way.

Today, the former Legion site is being used as a staging area for an active development on Water Street in St. Andrews. Peter K. Gowan Construction Ltd. is proud to be providing excavation and sitework services in support of this upcoming retail and condominium project.


Project Spotlight: Brick Wall Removal – Former St. Andrews Fire Station

Take a look behind the scenes in video short as Peter tackles the removal of a failing brick wall at the former St. Andrews fire station — a key step in making the site safe again for the local Legion.

Need help with site demolition or land clearing? Let's talk.

 Whether it's clearing the way for something new or safely removing what's no longer needed, I'm here to get the job done right.

Contact me today to discuss your project.

0
×
Stay Informed

When you subscribe to the blog, we will send you an e-mail when there are new updates on the site so you wouldn't miss them.

Very Accommodating With Our Wild Schedule
Clearing the Way for New Beginnings

Ready to get things moving?

Whether you’re clearing land, installing a septic system, hauling material, or building a seawall that's meant to last, we’re here to help — and happy to talk through what you need. Let’s get your project started.
Call our office
1-506-754-5956
Send a message
Info@PeterKGowan.com
Our Company
Helpful Links
Follow Us

Login